24
Dec

Lachlan Renovation

This is the renovation that we started mid November. A-Frame house at Lachlan. Started with an empty mezzanine floor, got bulk of the frame up in the rain and wind, then started work installing the new dorma windows and gable end window.  All roofed and cladded before the Christmas break along with electrical ruff-in and hot & cold plumbed and drains in. Passed framing and plumbing inspections ready for the plasterer over the Christmas break.